Skip to main content

A can do a work in 15 days and B in 20 days


A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :
A.
1
4
B.
1
10
C.
7
15
D.
8
15



Answer: Option D
Explanation:
A's 1 day's work =1;
15
B's 1 day's work =1;
20
(A + B)'s 1 day's work =(1+1)=7.
152060
(A + B)'s 4 day's work =(7x 4)=7.
6015
Therefore, Remaining work =(1 -7)=8.
1515








Comments

Popular posts from this blog

It takes 10 days for digging a trench of 100 m long, 50 m broad and 10 m deep. What length of trench, 25 m broad and 15 m deep can be dug in 30 days ?

 It takes 10 days for digging a trench of 100 m long, 50 m broad and 10 m deep.  What length of trench, 25 m broad and 15 m deep can be dug in 30 days ?       a) 400 m          b) 200 m          c) 100 m          d) 89m Expl : More days, more length (Direct)       Less breadth, more length (Indirect)       More depth, less length (Indirect       Days      10 : 30;       Breadth  25 : 50;                  : : 100 : x       Depth    15 : 10;                     :. 10 * 25* 15 * x = 30 *50 * 10 *100             x= (30*50*10*100)/10*25*15 = 400      So the required length = 400m